Finish Your Basement

Questions and answers

Everything homeowners ask us most, grouped by topic. Rules for your town are on your area page.

Working with us

What happens at the free estimate?

An experienced local builder visits your home, looks at the space, talks through what you'd like and answers your questions. It's free, and there's no obligation to go ahead.

How much does it cost to finish a basement?

It depends on the size, the layout, bathrooms or a kitchen, windows and the finishes you choose. Two basements of the same size can end up very different, which is why we don't publish a price list. After the free estimate, your builder puts together a written quote for your plan.

Do I need a permit?

Yes. Basement development needs a building permit from your municipality, plus permits for the trade work. Your builder can apply for them and book the inspections.

How long does it take?

It depends on the size of the project, permit and inspection timing, and the materials you choose. Your builder can give you an estimated schedule with your quote.

I'm not sure what I want yet. Is that OK?

Yes. Most people start with a rough idea. Your builder can suggest layouts and options at the estimate, and our guides cover the basics before you book.

Who signs my contract?

Your contract is with the independent general contractor who builds your basement. Their name is on your written quote.

Will my home be a mess?

Some dust and noise come with any renovation. Ask your builder at the estimate how they'll close off the work area and protect the rest of your home.

Basement Development

About basement development →
Do I need a permit to develop my basement?

Yes. Building or finishing a bedroom, bathroom or living room needs a building permit, plus electrical, plumbing, gas or HVAC permits for the trade work. Your builder can apply for them and book the inspections.

How long does a basement development take?

It depends on the size of the project, permit and inspection timing, material availability and any changes made along the way. Your builder can give you an estimated schedule with your quote.

Can my basement have a bedroom if the window is small?

Only if there's a way out that meets code: a window with at least 0.35 m² of clear opening and no side under 380 mm, or an exterior door. If your window is too small, it can be enlarged as part of the project.

What should I check before finishing a basement?

Look for moisture or cracks on the walls and floor, make sure the ground slopes away from the house, and extend downspouts 1.5–2 m from the foundation. Your builder can look at it with you at the free estimate.

Should I test for radon first?

Health Canada recommends testing every home for at least 3 months on the lowest level you use. If levels are above 200 Bq/m³, it's easier to plan mitigation before the walls and floors are finished.

Can I add a bathroom later?

Yes, but roughing in the plumbing while the basement is open usually costs much less than breaking into finished walls and floors later.

Do I need a permit to renovate my basement?

It depends on the work. Flooring, paint and cabinets don't need one. New rooms, structural changes, new or larger windows and new wiring or plumbing do. Your builder can confirm what applies and take care of the permits.

Can you work around my existing finish?

Often, yes. Your builder looks at what's there at the free estimate and tells you what could stay, which can keep the cost down.

The previous owner finished the basement without permits. What now?

Mention it at the estimate. Your builder can work out what needs to be opened up, inspected or redone under a permit, and include it in the plan.

Will I need to update the smoke alarms?

Often, yes. Alarms must be hardwired and interconnected, and a renovation can require adding them. Hardwired alarms can't be swapped for battery-only ones.

Can I add a bathroom without a rough-in?

Usually, yes. New drain lines are cut into the concrete floor and connected to the main drain. Your builder can check drain depth and location at the estimate.

Do I need a permit for a basement bathroom?

Yes, in most cases. A new bathroom needs a building permit and a plumbing permit, plus an electrical permit for new wiring. Your builder can apply for them.

How long does a basement bathroom take?

It depends on whether there's a rough-in, the finishes you choose and inspection timing. Your builder can give you an estimated schedule with your quote.

Should I add a backwater valve?

If your home was built before 1989 and doesn't have one, it's worth considering. It stops sewage from backing up into your basement, and EPCOR or Strathcona County may cover part of the cost.

Does a basement bathroom need a fan?

Yes. An exhaust fan ducted outside is a must. Basements hold moisture, and a bathroom without ventilation leads to mould.

Wet Bars & Kitchenettes

About wet bars & kitchenettes →
Do I need a permit for a basement wet bar?

The sink needs a plumbing permit and new circuits need an electrical permit. In Edmonton, a wet bar for your own use doesn't need a development permit. Your builder can take care of the permits.

Is a kitchenette the same as a legal suite kitchen?

No. A kitchenette for your family is part of your home. A kitchen in a separate unit with its own entrance can make it a secondary suite, which has extra zoning and code requirements.

Can I put a stove in my basement kitchenette?

Ask your builder at the estimate. Cooking appliances add electrical and ventilation needs, and a full kitchen can change how the city sees your basement.

Where's the best place for a wet bar?

Usually close to existing plumbing, which keeps the cost down. Your builder can look at your drain and water lines at the estimate.

Does every basement bedroom need an egress window?

Every bedroom needs a way out: a window with at least 0.35 m² of clear opening and no side under 380 mm, or an exterior door. Rooms like a rec room, bathroom or laundry room don't.

Do I need a permit for an egress window?

Yes. In Edmonton, adding a window or changing its size needs a permit. Replacing a window with the same size doesn't. Your builder can take care of the permit.

Do buried utilities need to be located first?

Yes. Before any digging, buried lines are located through Utility Safety Partners. The service is free, but requests need at least three full working days.

Will an egress window leak?

Not if it's installed and drained properly. The well sits above grade, drains through washed rock, and a cover keeps snow and rain out.

How long does it take?

It depends on the foundation, access for digging and inspection timing. Your builder can give you an estimated schedule with your quote.

Still have a question? Ask your builder at the free estimate.